Circor Pipeline Engineering delivers quick turnaround  

Easy and flow management technology agency Circor Pipeline Engineering has equipped a buyer with a rapid opening closure (ROC) for a 48-in gas filter vessel within 10 weeks.
A ROC offers a quick opening access point to pipelines or stress vessels, for the set up or removing of kit.
Built by Pipeline Engineering in Catterick, UK, the 48-in ASME U-Stamp massive ROC closure needed to be delivered to the customer in Houston, Texas in 10 weeks. It was built and delivered on time using the new giant Vertical Turning Center (VTC) installed in Catterick in 2020 to cut back manufacturing lead time.
Following the delivery, Pipeline Engineering supplied assist with set up and welding from its Houston facility.
The closure has been outfitted with the model new CIRCORSmart tag for traceability, document entry and straightforward buyer help when it goes into operation.
Share

Leave a Comment